Spedizione gratuita con Packeta per un prezzo superiore a 79.99 €
BRT 7.99 Punto BRT 7.99 DHL 7.99 HR Parcel 7.49 GLS 3.99

Case Study Analysis of the Overhead Rate Impact Model Used During the C-5 Maintenance Source Selection

Lingua IngleseInglese
Libro In brossura
Libro Case Study Analysis of the Overhead Rate Impact Model Used During the C-5 Maintenance Source Selection William N Ward
Codice Libristo: 08242527
Casa editrice Biblioscholar, novembre 2012
The Overhead Rate Impact (ORI) model was used during the C-5 Maintenance source selection to evaluat... Descrizione completa
? points 168 b
71.07
Magazzino esterno Inviamo tra 15-20 giorni

30 giorni per il reso


Potrebbe interessarti anche


Meeting Combatant Commanders' Needs John S Morris / In brossura
common.buy 71.07
Souvenirs du Mexique, 1864-1867. [With maps.] Alfred Louis Smissen / In brossura
common.buy 26.86

The Overhead Rate Impact (ORI) model was used during the C-5 Maintenance source selection to evaluate the impact the new workload would have on the existing overhead rates. The objectives of this research study were to evaluate the ORI model and to identify the lessons learned from this source selection. To accomplish these objectives, interviews were conducted with members of the source selection team who were on the Cost Integrated Product Team (IPT). The experts were asked to identify the strengths and weaknesses of the ORI model and to make recommendation on how to improve the model. This study identified strengths and weaknesses of the ORI model. The strengths identified by the research are that the model was easy to use and the fact that the model can calculate overhead savings quickly. The weaknesses identified by the research are that the model uses an average overhead rate for the entire facility, the accuracy of the inputs is questionable, the model does not address limits to the amount of excess capacity, and that the model does not account for the theoretical limit to savings. Based on these findings, this research makes recommendations of how overhead savings should be evaluated in future source selections. The recommendations are that overhead savings should be calculated at the lowest possible level, the amount of existing excess capacity should be evaluated, the rate and factor inputs to the model should be validated at the lowest possible level, and evaluators must recognize the theoretical limit to potential overhead savings.

Informazioni sul libro

Titolo completo Case Study Analysis of the Overhead Rate Impact Model Used During the C-5 Maintenance Source Selection
Lingua Inglese
Rilegatura Libro - In brossura
Data di pubblicazione 2012
Numero di pagine 64
EAN 9781288306015
ISBN 9781288306015
Codice Libristo 08242527
Casa editrice Biblioscholar
Peso 132
Dimensioni 189 x 246 x 3
Regala questo libro oggi stesso
È facile
1 Aggiungi il libro al carrello e scegli la consegna come regalo 2 Ti invieremo subito il buono 3 Il libro arriverà all'indirizzo del destinatario

Accesso

Accedi al tuo account. Non hai ancora un account Libristo? Crealo ora!

 
obbligatorio
obbligatorio

Non hai un account? Ottieni i vantaggi di un account Libristo!

Con un account Libristo, avrai tutto sotto controllo.

Crea un account Libristo